One of the objectives of the CDBI is to recommend 'best practices' policies and procedures to support design-build utilization. It is therefore a priority for the Institute to develop a practice manual that provides guidance and recommendations on the successful delivery of design-build.
| 100 Series: Introduction and General (Published in 2000) |
| |
| 1.0 |
Glossary of Common Design-Build Terminology |
| 2.0 |
Comparative Design-Build Overview in Context of Other Delivery Methods |
| 3.0 |
Design-Build Variants |
| 4.0 |
Consultants |
| 5.0 |
Professional Regulations |
| |
| 200 Series: Procurement and Award (Published in 2000) |
| |
| 1.0 |
Introduction |
| 2.0 |
Developing RFQ's |
| 3.0 |
Developing RFP's |
| 4.0 |
Developing Site Information |
| 5.0 |
Developing Owners Statement of Requirements |
| 6.0 |
Developing Owner's Selection Criteria |
| 7.0 |
Award Process |
| 8.0 |
Payment for Proposals |
| 9.0 |
Patents and Copyrights |
| |
| Document 205: Methodology Assessment Matrix (Republished in 2007) |
| |
| |
Download the CDBI Methodology Assessment Matrix (PDF) |
| |
Document 210: Request for Proposal Guide (Published in 2004) Click here for more information. |
| |
| 1.0 |
Introduction |
| 2.0 |
Information To Proponents |
| 3.0 |
Proposal Form |
| 4.0 |
Submission |
| |
300 Series: Responding to RFQ's & RFP's (Published in 2004) Click here for more information. |
| |
| 1.0 |
Analyzing RFQ's |
| 2.0 |
Team Assembly |
| 3.0 |
Responding to RFQ's |
| 4.0 |
Responding to RFP's |
| 5.0 |
Interpreting the Owner's Statement of Requirements |
| 6.0 |
Developing Proposal Designs |
| 7.0 |
Responding to Draw/Build Proposal Calls |
| |
Document 310: Conceptual Estimating (Published in 2004) Click here for more information. |
| |
| 1.0 |
Introduction |
| 2.0 |
Factors Influencing Cost |
| 3.0 |
Estimating Methods |
| 4.0 |
Elemental Format |
| 5.0 |
MasterFormat |
| 6.0 |
Implementation |
| |
| 400 Series: A Guide to Project Delivery (To be Published in 2008) |
| |
| 1.0 |
Introduction |
| 2.0 |
Agreements |
| 3.0 |
Design |
| 4.0 |
Schedule and Cashflow |
| 5.0 |
Construction |
| 6.0 |
Payment |
| 7.0 |
Changes |
| 8.0 |
Dispute Resolution |
| 9.0 |
The Role of Authorities Having Jurisdiction |
| 10.0 |
Post Construction |
| 11.0 |
Conclusion |
| |
| 500 Series: Model Forms |
| |
| |
Document 14 - 2000 Design-Build Stipulated Price Contract |
| |
Document 15 - 2000 Design-Builder/Consultant Contract |